Close
e.g. Restaurants, Taxis or a business name

Modiin's Municipal Swimming Pool

Modiin Sport Center, Emek Zevulun 5, Modiin
Enlarge map
Waze
Last Updated: over 2 weeks ago

For the opening times and for prices of memberships (summer season or annual), kartisiyot and one-off entries - please see "Hours" further down the page.


Main pool with three connected swimming pools: half Olympic-sized pool, 80-90 cm deep children's pool and connecting area between the two pools. In-pool seating and equipment to aid handicapped entry.

Additional facilities:

  • 83 m2 toddler pool with full shading
  • Canteen
  • Men's and women's changing rooms with handicapped access
  • Grassy areas with sun shades, chairs and tables
  • Shaded toddler play equipment
  • Sports courts suitable for soccer and beach volley ball
  • First aid room
  • Free parking

Pool Cover

In May 2017 work on the pool roof cover was completed. The cover was installed over the entire area of the pool, with a permanent cover of the learner's pool (shallow area in the main pool), allowing swimmers to enter straight from the changing room to the covered and heated section. A four-part curved roof covers the half Olympic-sized pool, two of which are static and two of which can be moved, powered by an electrical engine system, allowing the opening of the roof in summer and closing of the roof in winter.

The covers is constructed from durable plastic, allowing sun light to enter on the one hand, while preventing overheating and creating shade on the other hand.

In addition to the pool heating system, the roof structure also includes a lighting system, and heating and air conditioning in order to allow the use of the pool during the winter.

The cover also makes it possible for the Iriyah, in collaboration with the Education Ministry and Minhelet Ofek, to implement the kita heh swimming instruction project during the morning hours, and during the rest of the day residents of the city will be able to swim in the covered pool throughout the year.


Acoustics improvements - Summer 2018 Update

The first stage of acoustics improvements at the municipal pool has been completed. At this stage, acoustic boards have been installed in the area of the children's pool and the shallow pool.

The work was carried out by Minhelet Ofek, who is responsible for the operations of the pool and after checking with acoustics consultants. In the framework of the check, there was a professional computerized examination of the echo points in the pool and how to install the acoustic solutions.

Hours

Contact

Enlarge map
Waze
Waze

Recommendations

Be the first to recommend this!
Content policy
Save
Also on ModiinApp...

ModiinApp was started as a small project by 4 friends (three of us live in Modiin - 2 olim and 1 sabra), and quickly grew into the best source for information on local businesses and deals in Modiin. Everything we do is local and authentic. We hope you like it. Get in touch!